Feature #13431
Ability to switch between the chart dates
| Status: | New | Start date: | 2011-02-28 | |
|---|---|---|---|---|
| Priority: | Should have | Due date: | ||
| Assignee: | - | % Done: | 0% |
|
| Category: | - | |||
| Target version: | - | |||
| Votes: | 0 |
Description
I can see the last 24h in the chart very detailed. But now i want to see the 24h of yesterday and last week.
It would be great if I could switch between the dates of all fixed periods.