Actions

Meetings-August-2011 » History » Revision 13

« Previous | Revision 13/20 (diff) | Next »
Oliver Hader, 2011-08-22 11:55


Meetings-August-2011

Agenda

to be discussed

  • ...

Protocols

Monday, August 21st 2011

  • Time: 11:00-12:00 CEST
  • Participants: Benni, Ingmar, Olly

Friday, August 19th 2011

  • no meeting

Thursday, August 18th 2011

  • no meeting

Wednesday, August 17th 2011

  • no meeting

Tuesday, August 16th 2011

  • no meeting

Monday, August 15th 2011

  • no meeting

Friday, August 12th 2011

  • no meeting

Thursday, August 11th 2011

  • no meeting

Wednesday, August 10th 2011

  • Time: 15:00-15:10 CEST
  • Participants: Benni, Olly

[Olly]
i Worked on security issues and other bugfixes for TYPO3.org

[Benni]
i Worked on other TYPO3 projects and found some other TYPO3 bugfixes

Tuesday, August 9th 2011

  • Time: 11:05-11:30 CEST
  • Participants: Ingmar, Benni, Olly

[Ingmar]
➜ will be on vacation the next 1.5 weeks and back on August 22nd

FAL table structure extension "file" 
https://github.com/ingmars/FAL-Table-Structure-Extension
FAL now uses an Extbase-like directory structure:
http://git.typo3.org/TYPO3v4/Incubator.git?a=tree;f=t3lib/vfs;h=b2345a5e1ff8557f87e2a9761c5493d51b25198d;hb=project-fileabstraction

➜ Ingmar kicks off a meeting with DAM team Friday night, if that works for everyone.
➜ first bi-weekly-status report to BLE und project participants, t3a-board, etc.

[Olly]
✔ Skype call with Peter Pröll and Lars Zimmermann to kick-off the Government Package
i Peter will have the concept ready until end of August 2011
i Lars will start with first layouts end of this week and aims to be finished until end of August 2011
i Lars' scope: design/layout, markup, CSS, HTML5 boilerplate
i Peter's scope: concept/structure, texts, behaviour of the package and integration
➜ next Government Package status meeting: August 19th 2011, 15:00 CEST
➜ Analyze deployment/control script and kick-off with Jeff

[Benni]
➜ Will work on a21 glossary the next days again, make it accessible and send to a21

[General]
☠ discussion in content rendering group list concerning HTML5 and backward-compatibility of TYPO3 for older browsers, e.g. IE7

Monday, August 8th 2011

  • Time: 11:10-12:50 CEST
  • Participants: Ingmar, Olly

[Ingmar]
✔ had a FAL meeting with Andreas, reworked classes structure, created (mostly final) table structure

[Olly]
✔ Analyzed BLE master campaign (BMELV)
i Did not receive further requirement concerning Government Package form BLE
➜ Meeting with Lars and Peter today concerning Government Package
➜ Analyze deployment/control shell script for TYPO3
➜ Will contact Jeff concerning availability and deployment/control project

[General]

FAL
Using Extbase is too risky with all combinations of versioning, localization etc.
But lets name methods in the repository in the way they are named in Extbase (e.g. implementing interface Tx_Extbase_Persistence_RepositoryInterface, or a modified deviation)

Configuration Module / Install Tool
There should be a central configuration module for all BE modules.
Maybe that should go into a revamped install tool
See the last two wireframes of http://forge.typo3.org/issues/10214

Friday, August 5th 2011

  • no meeting

Thursday, August 4th 2011

  • Time: 11:00-11:30 CEST
  • Participants: Benni, Olly, Ingmar

[Ingmar]

✔ Protocol draft done
➜ Send protocol to BLE
➜ Have FAL meeting with Andreas tomorrow (Friday)

[Olly]
✔ Had phone calls with BLE; got a new dump of the gov package
✔ Gov package/packaging is already prepared in Build system and in Git (blank package)
➜ Soon kickoff in gov package project (Peter P and Lars will be informed)

[Benni]
i no news

[General]

i Discussion on packaging in the future.
We need separate versions of packages (such as Introduction package) in which we could demo new features for the latest branch (dev branch) while the stable branch stays the same

Deployment/management script:
Deployment and management script is not the same.
We decided that the delta-deployment script is not highest priority; the management and update script ("trush") is more more important.
First task: Installing and updating of a TYPO3 installation.
Jeff could start working on that. Olly would like to have a meeting with him next week.

How are the interrelations in what concerns the Install Tool code between Benni's/Patrick's part and what Jeff would do?
They could work largely independent, as Benni's/Patrick's part is more about the view and the controller, whereas Jeff's part would rather use the lowlevel things in t3lib_install and the SQL parser.

i !!! BLE project meeting prior to the conference (Monday 3rd - Thursday 6th October), somewhere around Frankfurt/Offenbach/Hanau.

Wednesday, August 3rd 2011

  • Time: 11:10-11:50 CEST
  • Participants: Benni, Ingmar, Olly

[Ingmar]
✔ Steffen Kamper will work on ExtJS4 migration until end of August
➜ reviewing protocol and sending to BLE
➜ FAL API coding. Possibly having meeting with Andreas Wolf next week.
i Holidays: from 10th to 21st July 2001

[Olly]
➜ Have a phone call with Bernhard, since Sacha seems to be on holidays
➜ Kick-off with Lars and Peter on Gov Package on Friday

[Benni]
i Patrick Rodacker will join the BLE team for two weeks in September 2011 to solve several issues with the Install Tool

[General]
➜ Discuss: generic content browser

Tuesday, August 2nd 2011

  • Time: 11:00-11:30 CEST
  • Participants: Olly, Ingmar

[Ingmar]
✔ Sent mails to Steffen Ritter and Stanislas regarding their availability / reconfirming. Stanislas for DAM HTMLArea integration, Steffen R. for DAM in general
➜ reviewing protocol and sending to BLE
➜ FAL API coding. Possibly having meeting with Andreas Wolf next week.
i Holidays: from 10th to 21st July 2001

[Olly]
✔ Refactored and restructured distribution packaging
✔ Reminded Sache concerning the "todos" (dump, design specification, info on proxy problem)
➜ Have a phone call with Sacha
➜ Kick-off with Lars and Peter on Gov Package on Wednesday
i no much activity today due to 4.6-beta1

[General]
➜ Invoices on the BLE project should have the budget code 8031 somewhere visible

Monday, August 1st 2011

  • no meeting

Updated by Oliver Hader over 10 years ago · 13 revisions