h1. Feature Freeze in 4.5
2
3
On 17th of November we released [[TYPO3 4.5.0beta1]]. According to our [[Release Plan]] this marks the beginning of the feature freeze phase.
4
5 4 Ernesto Baschny
The feature freeze means that the code base is feature complete and we will work on stabilizing the release in order to produce an already very mature 4.5.0 release in January 2011. Major goals now are:
6 1 Ernesto Baschny
7 5 Ernesto Baschny
* Finish and polish the projects already added from our roadmap ([[Projects]])
8
* No new projects will be included
9 4 Ernesto Baschny
* Focus on fixing bugs and stabilizing
10 1 Ernesto Baschny
11 4 Ernesto Baschny
h2. Project status
12 1 Ernesto Baschny
13 4 Ernesto Baschny
The following projects were added in 4.5 and are under special attention, and might get (potentially functional or refactoring) follow-ups to stabilize their API or functionality until beta3:
14
15 1 Ernesto Baschny
* Trees, page tree, abstract classes
16 3 Ernesto Baschny
* UTF8 by Default (an Upgrade Wizard to convert existing installations to UTF-8)
17 1 Ernesto Baschny
* Workspaces
18
* Super search
19
* t3lib_mail
20
* Backend design (skinning)
21
* DBAL (e.g prepared searches everywhere)
22
* Linkvalidator
23
* Grid view
24
* stdWrap "everywhere"
25
26
The following projects didn't made it in the beta1 release, but the teams motivation and dedication proves that they deserve the chance to be included. So the last addition time for them is *beta2*.
27
28
* File abstraction layer (FAL)
29
* New Extension Manager
30 4 Ernesto Baschny
31
The following projects are under special consideration meaning their stability and matureness will be decided with the release of beta3. Either they are kept in the core or removed again:
32
33
* Page tree
34
* Super search
35
* Linkvalidator
36
* Grid view
37
* FAL
38
* New Extension Manager
39
40
h2. Schedule
41 1 Ernesto Baschny
42
The next steps involve two additional beta's, which will enable us to experience the gain of stability that we aim to acchieve from now on:
43
44
* Beta2 on 01.12.2010: Labels and textual strings *must* be ready, so that the translation teams can start working on that.
45
* Beta3 on 22.12.2010: Here we will kick have to remove again added features that are still not production ready, and those will have to try again in the next release (4.6).